Company Introduction
 
    Product

Performance Pledges

  Companies are paying close attention to technological services, the company has specialized technical services department.The company's products are designed for contact and after-sale technical service.

1, design, manufacture

(1) contract a week after the company's technical staff will be sent to the tender side.tender side to understand the progress of the design and construction of such projects, and technical personnel to carry out technical exchanges with the tender.

(2) to provide timely information and meet other technical information required tender side.

(3) the tender side, promptly sent technical personnel to the tender side proofreading drawings.

(4) the shortest period of time (four days) will teach them a good turn tender drawings checking.

(5) The person in charge of the project to tender at least once a month about the progress of a production.

2, and after-sale technical service

(1) user company's after-sales service principles : the supremacy of providing services; Solve problemsAfter analyzing the problem.

(2) technical services staff, I have the following qualifications : general compliance with the law and follow the rules and regulations.have a strong sense of responsibility and devotion, understanding and timely manner equipment design, and is familiar with its structure.a strong field work experience, familiar with the technology and rolling rolling technical adjustment to correct for on-the-spot guidance.health and the environment to adapt to the scene.

(3) cargo tender side to the scene, according to the tender notice sent to help install side.

(4) In accordance with the tender request promptly sent technical personnel to the site to participate in test equipment.

(5) In accordance with the tender request that the portrayal of the company's products.We are committed within 48 hours of receiving the notice arrived at the scene tender side.

 


4, the specific arrangements for personnel :

NO.

Technical services

Charge

Remarks

1

Technological exchanges

Vice president (chief engineer)

2

Design drawings Proofreading

Technical directors

3

Theory

Technical director or chief engineer

4

Operation

minister of production

5

Physical examination

Project Manager

6

Assist in the installation, debugging

Technical directors

7

Quality treatment

Technical directors

Managing participation

Hits:2643  UpdateTime:2008/4/8 【Print】 【Close
Copyright © JIANGSU JIULIAN METALLURGY MACHINERY CO.,LTD.
Add:JIULIAN ROAD 6#,JINGJIANG ECONOMIC DEVELOPMENT ZONE,JIANGSU,CHINA
Tel:0523-84616240 Fax: 0523-84616242